HEC

The Production Era Begins.

Consolidated Non-Provisional Utility Locked

HECTEC has successfully transitioned from provisional architecture to non-provisional utility filings. This milestone marks the shift from engineering modularity (PPA A, B, & C) to production-ready hardware for the Winter Park estate.

"Assembled in Winter Park, FL — we are revealing the production-run hardware that makes the Florida Digital Bill of Rights a physical reality."

Following our consolidated filing (US 19/522,001), we are opening pre-orders for our production-run units. These are the physical implementations of our White Stone Protocol—the first hardware designed specifically to enforce individual sovereignty in a world of total surveillance.

Secure Your First-Run Unit

We are accepting pre-orders for the HECTEC ARK and Sovereign Stack, each unit proudly assembled in Winter Park for a limited selection of residences.

Join the Production Cycle
The Founders
Winter Park, Florida
← Return to Gateway